CUSTOM TWIN DELIVERY

Custom Visualization Development

Industrial digital twins — trainable, verifiable, operable

Same label “digital twin”. Different delivery.

Typical market offers

Three shared problems

  • Art modeling detached from engineering
  • Data via Excel dumps
  • Demo screens outside business flow

GINHE

Three principles

  • CAD geometry as single source of truth
  • Live PLM / MES / PLC / SCADA links
  • Into training, verification, and O&M

Geometry as truth

45+ CAD formats direct-read, metadata preserved

Engineering data enters the twin as-is. Design changes hot-update — no remesh.

Coupled to real systems

PLM / MES / PLC / SCADA / video

Embed in process, TPM, and video recall so digital tracks the floor.

Hardware to cloud

Consoles / screens / on-prem / K8s / web

Air-gap, cluster scale-out, cloud render — ship the form your scene needs.

Delivery window

3 – 12 mo

First MVP as fast as 90 days

CAD formats read

45+

No remesh required

Availability

99.99%

Active-Active multi-replica

After-sales cover

3 – 13 mo

Source shipped with delivery

CAD Format Support

Full format list

Five-step delivery, fully traceable

Every milestone has documents. No black-box promises.

01

Needs diagnosis

1 – 2 weeksRequirements spec

Align business, engineering, and IT: find losses, define scenes, bounds, and acceptance.

You receive

  • Scene priority list
  • Draft interface inventory
  • Milestones and acceptance
02

Data governance

2 – 4 weeksData access inventory

Inventory CAD, IoT, and APIs; clear format, permission, and history gaps early.

You receive

  • Interface protocol docs
  • Data quality baseline
  • Security notes
03

Twin modeling

3 – 6 weeksScene master + asset library

Build UE5 from CAD — materials and physics versioned; changes hot-update.

You receive

  • UE5 scene master
  • Classified assets
  • Physics baseline
04

Feature integration

3 – 6 weeksIntegration test report

Wire interaction, system links, and hardware across train / verify / monitor flows.

You receive

  • Full-feature test report
  • API docs
  • Draft ops manual
05

Delivery & O&M

Warranty 3 – 13 moPackages + source + IP files

Go live into warranty with hot scene updates for production change.

You receive

  • Full engineering source
  • Copyright certificate
  • Tiered maintenance agreement

Industrial render pipelines — pick by scene

Mix engines by scale, deploy environment, and endpoints.

Cross-platform light

Unity

Mobile inspect / AR maintenance / multi-device

  • Android / iOS native
  • ARKit / ARCore overlays
  • Mid/low device friendly

Tablet AR assist on the floor

Web light viz

Three.js / WebGL

Cockpit boards / BI embeds / light display

  • Pure browser, embeddable
  • GLTF / GLB after lightweighting
  • Pairs with chart libs

Management boards or MES monitors

Pipeline selection matrix

DimensionUE5UnityThree.js
Render qualityIndustrial fidelityMid-highMid
Physics depthPLC-gradeMidNone
Web deployPixel StreamingWebGLNative
MobileHigh-end onlyAll platformsAll platforms
Typical useTrain·verify·monitorInspect·ARWall·BI

Go-live starts O&M — it is not the end

Source and IP are contractual. Warranty response has clocks.

01

Full source delivery

You buy an asset, not a leash

After acceptance: full project, assets, and docs — extend in-house or via any vendor.

  • Full UE5 project
  • Blueprints / C++ (if used)
  • API and deploy manuals
02

IP certification

Copyright filing, clear ownership

We help file software copyright with you as owner; IP clauses sit in the contract.

  • Filing assistance
  • Ownership clauses in contract
  • Certificate archive (optional)

3 – 13 month tiered maintenance

Pick cover depth for your scene

Basic

3 months

You have IT; need a safety net

  • Bug fix; 48h response
  • Critical: 4h response
  • No new features or interface scope

Deep

13 months

Core production / training / HA scenes

  • Bugs + features + scene expand
  • Critical: 1h, 7×12
  • Monthly health + hardware re-integrate

Domestic stacks on request

Localization / Xinchuang readiness

Energy, rail, government, and finance-linked manufacturing can request localization.

OS

  • UOS
  • Kylin OS
  • OpenEuler

Database

  • Dameng DM8
  • KingbaseES
  • GaussDB

Hardware

  • Phytium / Kunpeng
  • Sunway review

Network & security

  • LAN / air-gap
  • SSO
  • Audit logs

Some high-fidelity features may lose performance on non-x86 — we flag alternatives in diagnosis.

What shipped counts

Deliverables and acceptance metrics written into contracts.

Port machinery / training sim

Automated quay crane driver trainer

Trainee sim + coach console + hardware for manual and semi-auto flows.

  • 6 CCTV streams in ms sync
  • 4 train / exam modes
  • PLC-grade hardware sim
  • Coach scoring and auditable records

Smart manufacturing / virtual verify

Flexible line virtual verification

UE5 platform linked to PLM / TPM for line change, manufacturability, and balance.

  • 4–8 stations dynamic layout
  • PLM + TPM dual sync
  • On-prem / air-gap

Semiconductor / large-scale runtime

Semiconductor digital monitor sim

Fab AMHS: 3D monitor and health for OHT, Stocker, LPS.

  • 1000+ OHT on one screen
  • Refresh ≥ 5Hz
  • 99.99% availability

View all landmark cases →

FAQ

01 How are you different from 3D dashboard vendors?

We ship engineering assets: CAD direct-read, live systems, into business flow — not demo screens that only look alive.

02 How long do projects take?

Usually 3 – 12 months. Training sims ~6 – 10; virtual verify 4 – 8; shop-floor monitor 3 – 6. Diagnosis yields milestones and acceptance.

03 Can you integrate our PLM / MES?

Yes. Teamcenter, Windchill, SAP PLM, ENOVIA and peers are in experience; interface plan is fixed in diagnosis.

04 Do design changes force a remesh?

Usually no. CAD is the source; hot update rebuilds the scene.

05 LAN / air-gap deploy?

Yes — standard. Private K8s, SSO, and localization review on request.

06 Is source fully delivered?

Full delivery, no encryption or backdoors. IP is yours; extend in-house or with any vendor.

07 Rough pricing?

Training sims with hardware often ¥800k – ¥3M; virtual verify ¥500k – ¥1.5M; shop-floor twins ¥300k – ¥800k. Talk scene first, then SOW.

Start with a 30-minute solution call

Tell us your scene — we map a concrete plan.

  1. Your biggest business pain point
  2. Your stack (CAD / MES / PLC)

WeChat 15697431653 · Add WeChat with note “twin project”

Weekdays 09:00 – 18:00 live response

Initial assessment in 30 minutes · Talks confidential